Monday, September 27, 2010

We may have a house...

Carpet is in second floor hall, 3 small beds, downstairs roughed-in. Tomorrow, master, stairs, finish downstairs.

Nearly done. Holy crap. It is unbelievable to me to see what we've been able to accomplish. The carpeting finishes it off so much...

One little issue though - apparently, we upgraded over the builder stock carpet a lot because none of the doors open anymore - we'll have to shave off the bottom of all the second floor doors a bit.

Counting down:

- Speakers (dining, master)
- Volume controls
- Security system (2 keypads, 1 heat/smoke, 1 siren)
- Painting/caulking the built-in drawers
- Doors to the built-ins (ordered)
- Access door to tub in master bath (plug in tub)
- Seal grout, master bath
- Banister
- Shoe around kitchen cabinets
- Door knobs on exterior doors
- Mirror, towel ring, paper holder in downstairs bath
- Improve door clearance (NEW)
- Install shower door in master (hired-out; Thursday)
- Carpeting (hired-out, Monday)

No comments:

Post a Comment