Sunday, September 12, 2010

Slow Chinese Drywall Weekend...

Well, football season begins, Chinese Drywall work slows...

Sorry for not blogging yesterday, I was too distraught after the Hokies poor showing...

Al was a no-show yesterday and today, desipte several phone calls along the lines of "I'll be there in 2 hours"... Not too worried since his sander is here, the floors are sanded (which is the part I wasn't comfortable doing myself), and I haven't paid him a cent yet... I'll give him another couple days before firing him - as long as he finishes by Friday...

The master bath received most of the attention when football wasn't distracting us... sinks are installed and working, toilet is installed and working, about 1/3 of the shower tile is set, the bath-tub back-splash pattern has been started, which was the most challenging step. We chipped the mirror when we tried to install it... it may be swapped for two new ones... still deciding.

One major issue came up... apparently I forgot to plug in the jetted tub before sealing up the wall tile... sigh...

Picked up most of the wood needed to finish the closet shelves, looking on track... still counting down...