Thursday, June 17, 2010

Seal the deal

Slow Chinese Drywall day relatively speaking. Ductwork removed from the second floor. Built a jig for cutting insulation. Sealed all the doors and windows with foam insulation. Jennifer bought insulation springs so we can begin installing fiberglass tomorrow. Will probably stop at Lowes to pick up some work boxes for the new speaker wires and component cables; also want to add HDMI connection to the entertainment pre-wire.

Tomorrow, new ducts get installed upstairs; downstairs A/C unit gets connected. David, Angie, and Paul arrive. Touch up window and door seals. Begin installing insulation.