Today, window seat, more painting, more cabinets, some plumbing (kitchen sink connected), some more grout.
Tomorrow, microwave installed... more built-ins, more grout...
Statistics for the job...
David = 616 MH
Me = 598 MH
Congrats to Dave for being the first to 600...
Job Total = 2,093 MH
Looking at the schedule, we look ahead on trim and painting, but my schedule forecast for floor and carpet will be too short... I'll be tiling the master bath before carpet instead of after move-in, so that will push everything back... 50-50 for moving on original schedule - my guess is a week or two longer than originally predicted.