Was thinking about fixing the faucet at the master bathtub (both hot and cold point the same direction when off, or on for that matter - rather than being symmetrical that is - requires cutting copper (or melting solder and ripping apart), PEX, re-soldering, tight quarter PEX crimping to repair... I chickened out... maybe tomorrow...
So instead, I installed many lights. 2 pendant drops in the kitchen, a ceiling fan in William's room, and a flush ceiling mounted light in the laundry room. I also installed light bulbs (not serious labor, I know) in the foyer, upstairs hall, and both master closets. When all was done, the house was pretty lit up. Should be much easier to paint when the rooms are lit. Will's fan is a little more form than function I can say... looks like an airplane propeller... but doesn't work like one...
Tomorrow, assuming I still need to procrastinate the bath-tub faucet repair, I have a ceiling fan for Abby's room, and picked up the part I needed to re-install the kitchen table light. That probably won't take me long enough... but it will be the last of the ceiling lights. Maybe I'll re-install the heat detector for the alarm system... that goes in the ceiling (though I was going to replace it with new). Oooh, I can pick up 17 gallons of paint tomorrow - that might eat up some time...
Also, Mom and David return tomorrow, and I've confirmed the point-up for Thursday (after much confusion). Point up is a one-day deal - I thought it might take two days for mud to dry before sanding, guess not - which means wall-painting is still on track for Friday. Door and trim painting to commence immediately - or whenever I finish with the plumbing...
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment